Inline Modular Power Skid: A Rapid Design and Build Solution

When Hanley Energy was asked by a client to design and build a bespoke solution for an immediate critical infrastructure technology gap, the task could have seemed a daunting one.

What lay before them was a complex technical job which wide-ranging customization needs, but the real challenge was the rapid introduction of a new product, with an immovable go-live deadline (6-weeks, concept to deployment).

Despite the odds being stacked against them, the Hanley Energy team achieved the end goal, and on time delivery to bridge a client’s technical and operational needs – this highlighted the company’s excellence as a specialist innovator and integrator.

And the solution was so successful that Hanley Energy emerged with a new UPS power asset – an In-line Modular Power Skid – which it can deliver to other clients.

Click here to find out more